21 CN Spares Holdings

The Reliability Team carried out Spares optimisation analysis for 21 CN DCN (Data Center network):

It was a complex project to optimise the number of spares in order to minimise the cost of stock holding;

The team used a Spares Optimisation Package (SOP) for calculating FRU ( Field Replaceable Units) spares requirements based on –

Population of working units

FRU Reliability information in terms of MTBF

Turnaround Time

Stock Out Risk

This work resulted in significant cost savings by reducing the quantity of spares to the minimum level.

 

Case Studies

21 CN Spares Holdings

The Reliability Team carried out Spares optimisation analysis for 21 CN DCN (Data Center network): It was a complex project to optimise the number of spares in order to minimise the ...

Read more

Cadburys - Global Disaster Recovery (DR

Programme Managed the design and delivery of a global DR strategy enabling Cadbury Schweppes to invoke a hot standby DR plan. The design relocated locally hosted applications and services to ...

Read more

Fujitsu - Data Centre Refresh

Technology refresh across 6 globally positioned data centres and outsourcing of support services and operations to off shore supplier (Mahindra Satyam). Rel-Net programme managed the delivery of high level and ...

Read more
Commerce